Building or remodeling is a big decision. Here is exactly how a project moves from idea to completion with one team handling design, permits, and construction, so you know what to expect at every step.

The Journey

Seven phases.
One team.

Every project is different, but the path is the same. Here is what happens in each phase, what you receive, and where we need you.

Sheet A-001Phase 01

Discovery & Consultation

We talk through your goals, budget range, timeline, and property by phone, face to face, or over Zoom. We will be honest about what is realistic and how we can help.

You'll receive

  • A clear picture of your scope
  • Recommended next steps
  • A proposal for design services

Your part

Share your vision, inspiration photos, and any documents you already have.

Sheet A-101Phase 02

Site Analysis & Feasibility

We study the property and the rules that shape it: zoning, setbacks, height limits, easements, existing conditions, and any HOA requirements. This confirms what can be built before design begins.

You'll receive

  • Existing conditions documentation
  • Zoning and code summary
  • Consultants needed, such as survey, soils, or structural

Your part

Give us access to the property and share any existing plans, surveys, or HOA guidelines.

Sheet A-201Phase 03

Schematic Design

The creative phase. We explore layouts, flow, and the overall form of the building, then refine one direction together with you.

You'll receive

  • Concept floor plans
  • Massing and exterior concepts
  • Early budget alignment

Your part

React honestly. This is the easiest and least costly time to change your mind.

Sheet A-301Phase 04

Design Development

The chosen design becomes real. Materials, finishes, windows, structure, and mechanical, electrical, and plumbing systems are coordinated, and because we are also the builder, pricing is checked as we go.

You'll receive

  • Developed plans and elevations
  • Material and finish selections
  • A refined cost estimate

Your part

Make your selections and approve the design.

Sheet A-401Phase 05

Construction Documents & Permits

We prepare the detailed drawing set the city and our build team rely on, coordinate engineers, submit for plan check, and respond to corrections until your permit is approved.

You'll receive

  • A permit-ready drawing set
  • Permit submission and management
  • Approved permits

Your part

Sign the applications and cover agency fees. We handle the back-and-forth with the city.

Sheet A-501Phase 06

Construction

The same team that designed your project builds it. We schedule the trades, manage quality, coordinate city inspections, and keep you updated along the way.

You'll receive

  • A construction schedule
  • Regular progress updates
  • Inspection coordination

Your part

Walk the site with us at key milestones and make timely decisions when questions come up.

Sheet A-601Phase 07

Completion & Handover

Final inspections, a detailed walkthrough of the punch list, and closeout. We hand over a finished space along with the information you need to care for it.

You'll receive

  • Final inspection sign-off
  • Punch list completion
  • Warranty and closeout documents

Your part

Move in and enjoy it.

Know Your Options

Two ways
to build.

Most projects are delivered one of two ways. Understanding the difference helps you choose the right team.

Traditional

Design · Bid · Build
Design
Bid
Build
  • Two separate contracts: architect and contractor
  • Each phase waits for the one before it to finish
  • You coordinate between the two firms when issues come up
  • Real pricing arrives after the design is complete

Design-Build

Our approach
Design
Build
  • One contract and one point of contact
  • Design and construction planning overlap
  • Pricing is checked while the design is developed
  • One team is accountable from first sketch to final key

Timeline bars are illustrative only. Every schedule depends on scope, site conditions, and permitting.

Why Design-Build?

One team.
Every step.

We create successful, sustainable architectural projects through close client collaboration, thoughtful design, cost-conscious project management, advanced technology, and a shared commitment to realizing each client's vision.

Start Your Project ↗
01

Faster Project Delivery

Design and construction overlap rather than sequence — we begin procurement and site work while design is still being refined. Projects can often finish sooner than with traditional delivery, which means you open sooner, generate revenue earlier, and stay ahead of market conditions.

Overlapping scopes eliminate sequential delays
02

Greater Cost Certainty

When the same team designs and builds, constructability is baked into every decision. We know what things cost before we draw them. No expensive redesigns when a contractor says they can't build the plans. No inflated bids. What we quote is what you pay.

Single-source accountability protects your budget
03

One Point of Accountability

In the traditional model, architects and contractors point fingers at each other when things go wrong. With Duncan Design Build Architect Inc, there's only one call to make. We own the design, the permits, and the build — start to finish. If something needs to be resolved, we resolve it.

No gaps in responsibility. Ever.
04

Better Design + Buildability

Our architects don't design in a vacuum — they design knowing exactly how things get built, what materials are available, and what the budget allows. The result is architecture that's not just beautiful on paper but genuinely achievable, practical, and built to outlast trends.

Constructability embedded at the design stage
05

Streamlined Permitting

Because we are both the architect of record and the contractor of record, permit submissions are coordinated and complete. No back-and-forth between two separate firms. We prepare, submit, and manage every permit, approval, and inspection — keeping your project on schedule.

Architect + contractor = faster approvals
06

Reduced Risk

Design gaps, unforeseen conditions, and scope creep are the biggest risks in construction. When architect and contractor share the same information, the same site visits, and the same goals, these risks collapse. We find problems before they become change orders — protecting your project and your investment.

Shared risk model drives shared commitment
Speak the Language

Terms you'll
hear along the way.

1
Setback
The required minimum distance between a building and the property line.
2
Schematic Design
The early concept phase where the layout and overall form of the project are explored.
3
Plan Check
The building department's review of your drawings for code compliance before a permit is issued.
4
Title 24
California's building standards code. Its energy section sets the efficiency requirements new construction and many remodels must meet.
5
Change Order
A written change to the scope, cost, or schedule after construction has started.
6
Punch List
The final list of small items to complete or correct before the project is closed out.
7
Certificate of Occupancy
Issued by the building department to confirm a new building, or a change in use, is approved to be occupied.
8
ADU & JADU
An Accessory Dwelling Unit is a second home on the same lot. A Junior ADU is a smaller unit created within the existing home.
Before We Meet

Come
prepared.

You don't need everything on this list, but the more you can share, the more useful your first consultation will be. Consultations are by phone, face to face, or Zoom.

  • Your property address
  • A survey or existing plans, if you have them
  • Photos of the existing space or site
  • Inspiration images of styles you love
  • A budget range you are comfortable with
  • Your ideal timeline and any HOA rules

Let's draw your next chapter.

Tell us about your project and we'll get back to you.